Concrete delivery in Deira: bridges, old blocks and night pours

Getting concrete to Deira means crossing the Creek. From Al Quoz, about 18 km, our trucks take Al Maktoum Bridge or Al Garhoud Bridge, and those crossings decide most of the dispatch plan.

From our Al Quoz plant
about 18 km in a straight line
Ground conditions
Coastal, shallow saline groundwater
Main truck access
Al Maktoum Bridge, Al Garhoud Bridge

The Creek crossing

Both bridges carry heavy traffic for long parts of the day. A truck stuck on the approach is a load losing slump, so for Deira we plan around the crossing: retarder set for the full trip, and dispatch timed to avoid the busiest hours. Many Deira pours run at night for that reason, as long as the site is allowed to work then.

Old blocks, narrow lanes

Much of the work is redevelopment of old blocks, refurbishment near the souks and hotel projects. Plots are small and boxed in by neighbours, with lanes where a mixer cannot turn. Before booking, walk the route from the main road to the pump position and check where a 12 m³ truck can stop and reverse. Any road closure or permit for the pump on a public street goes through the authorities and building management; check with them.

With no room for a mobile pump beside the building, a placing boom mounted on the slab and fed by a line from the street is often the only way to reach every bay. A 43 m truck-mounted boom works when there is a clear frontage.

Coastal ground below the slab

Deira is coastal ground with shallow, saline groundwater carrying chlorides and sulphates. Substructure and piling mixes are designed for that exposure: GGBS blends, low water/cement ratio, and the cover and exposure class your consultant specifies. Send us the specification with the booking.

Pour planning

A hotel transfer slab of 220 m³ is 19 trucks. With a single access point, trucks cannot queue in the lane, so we space them tightly to the pump rate and hold the next load at a staging point you agree with us.

Smaller refurbishment pours, such as a new floor in an old building, are often only one or two trucks. These still need the bridge timing and a clear stop outside the plot, so book them like any other pour.

Questions from Deira sites

Why are so many Deira pours at night?
Less traffic on the bridges and cooler concrete. Confirm your site is permitted to work at night first.
Can you pump into a plot with no frontage?
Often, with a line and a placing boom on the slab. Send us the site plan.

Book a pour in Deira

Send the mix, the volume, the site location and your preferred start time. You get a plan and a quote the same working day.