Skip to content
Ready Mix, Dubai

Urgent order? Call: +971 52 998 9988

Concrete delivery for Ras Al Khor and Nad Al Hamar yards

Industrial yards, auto workshops and warehouses make up most of what we pour in Ras Al Khor and Nad Al Hamar. Trucks come in on Ras Al Khor Road or Al Ain Road, roughly 15 km from the plant.

From our Al Quoz plant
about 15 km in a straight line
Ground conditions
Inland urban plots
Main truck access
Ras Al Khor Road, Al Ain Road

Yard slabs that carry trucks

Workshop and yard slabs take heavy wheel loads, so the pour is usually thick and wide. A 1,000 m² yard at 200 mm is 200 m³: 17 trucks of 12 m³. These pours go straight from the chute when the mixer can drive onto the sub-base, which is the fastest and simplest placement.

If the sub-base cannot take a loaded truck, or the yard is behind a building, a 43 m boom set up at the gate reaches most of it.

Before any of that, a thin layer of blinding over the compacted ground gives a clean, level base for the reinforcement. It is a small volume, often one or two trucks, and can go in the day before the main slab.

Pacing the trucks

On a big yard slab the finishing crew sets the pace. We agree a target rate with your foreman, then dispatch to hold it: for example, 40 m³ an hour means a truck every eighteen minutes or so. If the crew slows, call the plant and we stretch the spacing before the trucks stack up at your gate.

For summer day pours the retarder is set for the trip from Al Quoz and the hour. A night start avoids the hottest part of the day and the worst of the traffic, if your yard can work at night.

Access in a working industrial area

Streets in the industrial blocks are full of parked vehicles, recovery trucks and deliveries. Clear the gate and the approach before the first mixer arrives. If you share access with neighbouring yards, check with them and with the landlord. Give us one site contact who answers the phone.

Questions from Ras Al Khor and Nad Al Hamar sites

Can mixers drive onto my sub-base?
Only if it is compacted to carry a loaded truck. If not, book a pump to place from the gate.
What mix for a workshop floor?
Often a fibre-reinforced mix to the strength your engineer specifies. Send the specification and we match it.
How many trucks for a 200 m³ yard?
Seventeen trucks of 12 m³, the last one a part load. We pace them to your finishing crew.

Book a pour in Ras Al Khor and Nad Al Hamar

Send the mix, the volume, the site location and your preferred start time. You get a plan and a quote the same working day.

Or give us a call at

+971 52 998 9988
WhatsApp us