Concrete pumping and delivery to Dubai Investments Park

Dubai Investments Park splits into two kinds of site: factories and warehouses on the industrial side, and residential clusters on the other. We reach both from Al Quoz along Sheikh Mohammed Bin Zayed Road or Expo Road, about 17 km.

From our Al Quoz plant
about 17 km in a straight line
Ground conditions
Inland urban plots
Main truck access
Sheikh Mohammed Bin Zayed Road, Expo Road

Industrial plots: volume and pace

Factory floors, loading docks and external hardstanding are high-volume pours with a clear rhythm. Volume divided by 12 gives the truck count, and the pump or finishing crew rate gives the spacing. 240 m³ for a factory floor is 20 trucks; at 40 m³ an hour, roughly one truck every eighteen minutes for six hours.

Wide internal roads make turning easy, but many plots have their own security gate. Check entry rules with the tenant or park management and give us the gate contact.

Loading dock walls and pits are smaller pours with more formwork than volume. Order them as separate deliveries rather than tacking them onto the floor pour, so the trucks are not held while the crew switches tasks.

Residential clusters: tighter setups

The residential side has mid-rise buildings close together, with shared access roads and residents nearby. Pump positions are tighter here. A 43 m boom from the access road reaches most slabs. When the building is set back behind another block, the 57 m boom is usually the answer. Community management may set delivery hours; check with them.

Distance, retarder and timing

Seventeen kilometres is enough for heat to work on a summer load. The retarder is set for the trip and the hour, and slump is targeted at discharge. Early-morning and night pours suit DIP well: less traffic on the main roads and cooler concrete. The plant runs 24/7; book on +971 52 998 9988 a day ahead, two days for pours over 150 m³.

For a long industrial pour, have a second finishing crew or a rest rotation ready. The trucks will keep coming at the agreed pace.

Questions from Dubai Investments Park (DIP) sites

Which pump for a residential block in DIP?
A 43 m boom from the access road in most cases, a 57 m when the pump must stand far from the building.
How far ahead to book a factory floor?
Two days for over 150 m³, so the truck rotation is ready.
Can trucks wait inside a DIP plot?
On industrial plots there is often space. On residential clusters, trucks are held at a staging point and called forward.